Engineering, Procurements and execution of Industrial projects for various engineering & Infra Structure Projects
Shifting of panels to site, preparation of foundation , base frame and erection of panel interconnection of shipping sections wiring, incoming out going cable laying and end termination, bus bar connections, testing of bus bar, relays, cables, breakers, ct’s, pt’s, earthing system, control & scheme, & Commissioning the system with load transfers as per up dated IE rules
Shifting of transformer to site, Erection alignment fixing of accessories, cable end terminations, providing Earthing system, testing of transformer & auxiliaries, oil filtration, checking of BDV, commissioning on no load and Commissioning the system with load transfer as per up dated IE rules
Erection of ground poles, platform poles, light fixtures with required mounting, glanding and termination from & to db
Cable end terminations, providing earthing system, testing of motor & auxiliaries, cable and panel, commissioning on no load and Commissioning the system with load transfer as per up dated IE rules
Shifting of vfd to site, foundation and base frame alignment. Cable laying, control wiring, cable end termination, testing of control & scheme, cables, commissioning on no load and Commissioning the system with load transfer per up dated IE rules
Pre Commissioning Test Winding Resistance Measurement Ratio Test Magnetic Balance Test Magnetizing Current Test Vector Group Test Insulation Resistance Test or Megger Test Dielectric Tests of Transformer Induced Voltage Test of Transformer Temperature Rise Test of Transformer
Stator winding resistive imbalance Stator winding insulation resistance (Meg-Ohm checks) Polarization Index (PI) Step Voltage test Surge test
Functional test (In this test we check control wiring, power circuit wiring, Breaker Testing & loop test) Relay Testing (all types of relays and power meters) IR Measurement and Hi-Pot test. Polarity Test. Primary Injection Testing. Secondary injection Testing. Breaker contactor resistance and timing. MV Drop Test Knee voltage Test depends upon CT. Relay coil resistance & Pickup voltage and Drop up voltage it depends upon ur relay. IR value for surge Arrestor.
We provide maintenance of indoor electrical substations on annual contract basis with adequate experienced manpower for handling shift duties and general duties as per industrial standards up to 33 Kv.
The ideal preventive maintenance program would prevent equipment failure. We provide Systematic inspection, detection, correction, and prevention of incipient failures, before they become actual or major failures for Transformers, Motors, Panels, Circuit breaker & Generators.
Condition monitoring help to keep your plant floor running productively by detecting potential equipment failures, We provide monitoring of condition in machinery (vibration, temperature etc.), in order to identify a significant change which is indicative of a developing fault
Preventive maintenance for diesel engine generators plays a critical role in maximizing the reliability of these standby systems. We provide General inspection, Lubrication service, Cooling system service, Fuel system service, Servicing and testing starting batteries, regular engine exercise
Periodic maintenance of lighting circuits and replacing faulty with new
IT is important to maintain proper Earthing system for safe operation of equipment and personal. We provide periodic maintenance of earthing systems with resistance measurement, soil resistivity measurement, revitalizing, electrode replacement and all.